Monthly RV sites: electric bills, deposits and permission
For a long RV stay, compare the full monthly bill and the occupancy agreement, then check whether the site and utilities support the intended season. Owning land or paying a campground does not by itself establish permission for permanent residential use.
A published monthly rate with a separate electric bill
The Paddock RV Park in Early, Texas advertises $650 monthly for two people, plus metered electricity at $0.19 per kWh and a $150 deposit. It lists nightly stays at $60 with electricity included and no deposit. These are one operator’s advertised terms, not regional averages.
At an assumed 1,000 kWh, electricity is $190. Adding that to $650 rent gives $840 for the month before other applicable charges. Adding the $150 deposit gives a $990 cash requirement across those items; the deposit is separate from consumption cost and is subject to its refund terms.
The park says the billing month follows arrival date without proration, electric usage bills with the next rent payment, and monthly cancellations require 30 days’ notice. It describes the deposit as refundable against damage and unpaid electricity, with conditions and a card-refund charge. Check the agreement and current quote before paying.
Seasonal suitability is an equipment question
| Item | What to obtain |
|---|---|
| Electric billing | Meter rate, billing interval, minimums and an initial reading |
| Deposit and cancellation | Refund conditions, notice deadline and payment fees |
| Winter services | Which water, sewer and access services remain usable |
| Occupancy | Allowed occupants, vehicles, pets and length of stay |
| Departure | Final meter reading, inspection and settlement procedure |
A park open in winter does not establish that the RV’s plumbing is freeze protected. Use the RV and installed equipment instructions for cold-weather operation. Skirting alone does not prove tanks, drains or water connections will remain above freezing.
Private land needs a separate approval check
Before moving onto a private lot, identify the local planning authority and ask which occupancy and utility permits apply to the parcel and proposed duration. Check wastewater disposal, potable water, electric connections, setbacks and access with the responsible offices.
A seller’s description of a park model or a landowner’s consent is not the same as residential approval. Obtain the applicable requirements before paying for land preparation or utility work. Compare that cost with a permitted monthly site rather than assuming private land is the cheaper legal option.